SUBCONTRACTOR REQUIREMENTS MANUAL


 

Document Identification      Revision         Document Title
TOC-59 118 SUBCONTRACTOR REQUIREMENTS MANUAL 
LST-27 10  GLOSSARY 
PDD-1001 SUBCONTRACTOR REQUIREMENTS PROGRAM DESCRIPTION 
PRD-1002 12  SAFEGUARDS AND SECURITY REQUIREMENTS 
PRD-1004 STEP BACK AND STOP WORK AUTHORITY 
PRD-1006 SAFETY SURVEILLANCE 
PRD-1501 WORK CONTROL 
PRD-2001 PERSONAL PROTECTIVE EQUIPMENT 
PRD-2002 FALL PROTECTION 
PRD-2003 LADDERS 
PRD-2004 SCAFFOLDING 
PRD-2005 WALKING AND WORKING SURFACES 
PRD-2006 AERIAL LIFTS AND ELEVATING PLATFORMS 
PRD-2007 10  HOISTING AND RIGGING 
PRD-2008 STEEL ERECTION 
PRD-2009 COMPRESSED GASES 
PRD-2010 WELDING, CUTTING, AND OTHER HOT WORK 
PRD-2011 ELECTRICAL SAFETY 
PRD-2012 LOCKOUTS AND TAGOUTS 
PRD-2013 CONCRETE AND MASONRY 
PRD-2014 11  EXCAVATIONS AND SURFACE PENETRATIONS 
PRD-2015 HAND AND PORTABLE POWER TOOLS 
PRD-2016 MATERIAL HANDLING, STORAGE, AND DISPOSAL 
PRD-2019 MOTOR VEHICLE SAFETY 
PRD-2020 HEAVY INDUSTRIAL EQUIPMENT 
PRD-2022 SAFETY SIGNS, COLOR CODES, AND BARRIERS 
PRD-2023 TEMPORARY FACILITIES 
PRD-2024 DEMOLITION 
PRD-2025 EXPLOSIVES SAFETY 
PRD-2030 OCCUPATIONAL MEDICINE 
PRD-2101 HAZARD COMMUNICATION 
PRD-2102 PREVENTING VECTOR-BORNE DISEASES 
PRD-2103 ASBESTOS 
PRD-2104 0 CONTROLLING EXPOSURE TO RESPIRABLE CRYSTALLINE SILICA
PRD-2105 HEAVY METALS 
PRD-2107 HEAT AND COLD STRESS 
PRD-2108 HEARING CONSERVATION 
PRD-2109 RESPIRATORY PROTECTION 
PRD-2110 CONFINED SPACES 
PRD-2111 EXPOSURE ASSESSMENTS 
PRD-2112 LASERS 
PRD-2201 FLAMMABLE AND COMBUSTIBLE LIQUID STORAGE AND HANDLING 
PRD-2202 FIRE PROTECTION 
PRD-3001 RADIOLOGICAL CONTROL REQUIREMENTS FOR ICP SUBCONTRACTORS 
PRD-4001 12  ENVIRONMENTAL REQUIREMENTS FOR SUBCONTRACTOR MATERIALS, EQUIPMENT, AND SERVICES 
PRD-5001 TRAINING AND INDOCTRINATION 
PRD-5002 10  DESIGN CHANGE CONTROL 
PRD-5003 VENDOR DATA CONTROL 
PRD-5004 PROCUREMENT DOCUMENT CONTROL 
PRD-5005 PROCEDURE DEVELOPMENT 
PRD-5006 SUBCONTRACTOR/SUPPLIER QUALITY PLAN (SQP) 
PRD-5007 DOCUMENT CONTROL 
PRD-5008 13  CONTROL OF PURCHASED ITEMS 
PRD-5009 MATERIAL TRACEABILITY 
PRD-5010 WELD RECORD PACKAGES AND PIPING TESTING PACKAGES 
PRD-5012 SURVEY EQUIPMENT CALIBRATION AND CONTROL 
PRD-5014 FIELD TEST CONTROL 
PRD-5015 11  CONTROL OF MEASURING AND TEST EQUIPMENT 
PRD-5016 MATERIAL AND EQUIPMENT STORAGE, HANDLING, AND MAINTENANCE 
PRD-5017 INSPECTION AND TEST STATUS 
PRD-5018 CONTROL OF NONCONFORMANCES 
     
Additional Documents  
PRD-183 25 RADIOLOGICAL CONTROL MANUAL
PRD-393 0 SUBCONTRACTOR FOSSIL-FUELED MOTOR VEHICLES AND HEAVY INDUSTRIAL EQUIPMENT - TECHNICAL SAFETY REQUIREMENT LIMITS FOR RWMC-AMWTP/ARP

 

 

 

 
 
  Who We Are   Procurement   Newsroom   Contact Us  
  About Fluor Idaho   Property Management   News Articles   Fluor Idaho  
  About Idaho Cleanup Project   Small Business   Press Releases   1580 Sawtelle Street  
  Leadership Team           Idaho Falls, Idaho 83402  
              (208) 533-0411  
  Projects   Careers   Community Outreach      
  Accelerated Retrieval Project       Administrative Record & Information Repository      
  Advanced Mixed Waste Treatment Project       Community Commitment      
  Environmental Restoration       Public Involvement      
  Integrated Waste Treatment Unit              
  Spent Fuel Management              
  Tank Farm Management              
  Waste Management