Skip Navigation LinksFluor Idaho Home > ARIR Home > Search Documents by Document ID
Search Documents by Document ID
Search
Document ID

 


5588 Results
Document Results
ViewDoc IDTitleRevTypeDateWAGAuthor
TBL-596MFC-766 RADIOLOGICAL END STATE01NOT SPECIFIED10/24/20199NOT SPECIFIED
NSI-26038NEW SITE IDENTIFICATION (NSI) - ANL-71 POTENTIAL TANK BETWEEN MFC SECURITY FENCES (SW SIDE OF MFC)00NOT SPECIFIED10/7/20192, 10NOT SPECIFIED
NSI-26039NEW SITE IDENTIFICATION (NSI)- ANL-72 MFC POTENTIAL ASBESTOS MATERIAL TO THE NORTH OF MFC-799 FOUNDATION00NOT SPECIFIED10/7/201910NOT SPECIFIED
NSI-26040NEW SITE IDENTIFICATION (NSI)- ANL-73 MFC UTILITY CORRIDOR EXCAVATION UNKNOWN SUBSTANCE AND POTENTIAL ASBESTOS00NOT SPECIFIED10/7/201910NOT SPECIFIED
CCN 324100TRANSMITTAL OF THE LIMITATIONS AND VALIDATION REPORTS AND AQUIFER MONITORING LETTER00NOT SPECIFIED9/10/20197ALBERICO, KRISTINA M.
DOE/ID-12012FISCAL YEAR 2018 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER00NOT SPECIFIED9/1/20193LAWRENCE, SARAH D., SHANKLIN, DEAN E.
EDF-11196DESIGN DRAWINGS FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/13/20197NOT SPECIFIED
EDF-11034DESIGN CALCULATIONS FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/13/20197NOT SPECIFIED
EDF-11035WATER-BALANCE MODELING FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/13/20197NOT SPECIFIED
EDF-11133GEOTECHNICAL MODELING FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/13/20197NOT SPECIFIED
EDF-11134SURFACE WATER MODELING FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/13/20197NOT SPECIFIED
SPC-2332CONSTRUCTION SPECIFICATIONS FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/6/20197NOT SPECIFIED
NSI-26037NEW SITE IDENTIFICATION (NSI) ANL-70 DEBRIS/BURN PIT IN NW CORNER OF MFC00NOT SPECIFIED8/2/201910NOT SPECIFIED
7282446INSTRUCTIONS TO FUTURE USERS OF THE FINAL DESIGN00NOT SPECIFIED8/1/20197NOT SPECIFIED
DOE/ID-12015DESIGN REPORT FOR THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/1/20197NOT SPECIFIED
DOE/ID-12000PRELIMINARY DECOMMISSIONING AND DEMOLITION PLAN FOR STRUCTURES WITHIN THE DESIGN FOOTPRINT OF THE OPERABLE UNIT 7-13/14 PHASE 3 SUBSURFACE DISPOSAL AREA EVAPOTRANSPIRATION SURFACE BARRIER00NOT SPECIFIED8/1/20197NOT SPECIFIED
DOE/ID-12019MFC CERCLA DEMOLITION WASTE LANDFILL CLOSURE PLAN AND POST-CLOSURE CARE PLAN00NOT SPECIFIED8/1/20199NOT SPECIFIED
CCN 324016ADDENDA TO TABLES 1 AND 3 OF THE GENERAL ACTION MEMO FOR GENERAL0POST ROD REMOVAL ACTION8/1/20192, 3, 7, 9, 114EINAN, DAVID
CCN 324015CONCURRENCE REQUEST FOR ADDENDUM TO TABLE 1 OF THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID-11293, REVISION 3) (CLN191596) 0POST ROD REMOVAL ACTION7/18/20193, 7, 114JOHANSEN, PETE
CCN 324014ADDENDUM TO TABLES 1 OF THE GENERAL ACTION MEMO FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (DOE/ID--11293, REVISION 3)(CLN191596) 0POST ROD REMOVAL ACTION7/17/20193, 7, 114CASE, JOEL
NSI-26019NEW SITE IDENTIFICATION (NSI) - PBF-39 - PBF REACTOR LOCATION (PART A & B)01NOT SPECIFIED7/9/201910NOT SPECIFIED
NSI-26020NEW SITE IDENTIFICATION (NSI) - TRA-83 (MTR REACTOR LOCATION)(PART A & B)01NOT SPECIFIED7/9/20192NOT SPECIFIED
NSI-26021NEW SITE IDENTIFICATION (NSI) - TRA-84 (ETR REACTOR LOCATION)(PART A & B)01NOT SPECIFIED7/9/20192NOT SPECIFIED
DOE/ID-12016ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 201900NOT SPECIFIED7/1/20192NOT SPECIFIED
RPT-1716INL SITE-WIDE INSTITUTIONAL-CONTROLS AND OPERATIONS-AND-MAINTENANCE ANNUAL REPORT - FY 201800NOT SPECIFIED7/1/201910NOT SPECIFIED
Page 1 of 224
Select a page:

Results Per Page